
Every claim we make is measured somewhere.
Test standards, factory QC and the documents we hand over with each shipment — because a performance table is only worth what the report behind it is worth.
What we test, and to which standard.
Windows are tested as a complete assembly, not as a profile. The values on our product pages come from these tests on the configuration we ship, and we will send the report for the exact build you order.
| Property | Standard | What it measures | Typical result (YFG90) |
|---|---|---|---|
| Wind load resistance | GB/T 7106 / EN 12210 | Deflection and safety under positive and negative pressure | Class 9 · 5.0 kPa |
| Water tightness | GB/T 7106 / EN 12208 | Rain penetration under pressure difference | Class 6 · 700 Pa |
| Air tightness | GB/T 7106 / EN 12207 | Air leakage through closed assembly | Class 6 · 1.5 m³/(m·h) |
| Thermal transmittance | GB/T 8484 / EN ISO 10077 | Whole-window U-value with a defined glass build | 2.0 W/(m²·K) |
| Acoustic insulation | GB/T 8485 / EN ISO 10140 | Airborne sound reduction (Rw) | 35 dB (Class 5) |
| Surface coating | Qualicoat / GB/T 5237 | Film thickness, adhesion, salt-spray resistance | 40–80 μm, 1,000 h NSS |
Seven checks before a crate is closed.
Incoming profile
Alloy grade, temper, wall thickness and coating thickness checked against the mill certificate. Rejected lots are returned, not re-graded.
Cutting & machining
First-off sample measured; ±0.3 mm on cut length, ±0.2 mm on hardware holes.
Corner joint
Corner crimp depth and injection-glue fill inspected; a 2 m diagonal check on every frame.
Glazing
Glass build verified against the schedule, setting blocks positioned, gaskets continuous at corners.
Operation
Every operable sash cycled 20 times; lock, handle and roller adjustment recorded.
Water test
Spray test at the specified pressure on a sample of each configuration; failures are stripped and re-sealed.
Packing
Unit number, opening mark and elevation reference on the crate; photo report filed against the project.
Certificates.
Copies are issued with the order documents, and originals can be couriered for tender submission.
Certificate no. and scope available on request
Covers coating and assembly operations
Declaration of performance per series
Issued against shipped configuration
From accredited third-party labs
BOM, section drawings, description, packing list
Test reports and certificate copies are available on request for tender submissions.
Warranty, in plain terms.


Packing that survives a monsoon crossing.
Frames are crated vertically, sashes separately, glass in A-frame racks. Corner protectors, EPE wrap and plywood crates with desiccant; every crate carries a unit-numbered packing list so the site can receive by elevation rather than by guesswork.
Send the schedule. We will send back a number you can build on.
WhatsApp a photo with dimensions, or send drawings and a window schedule. You will get a configuration proposal, a per-square-metre price and a delivery date — usually within 12 working hours.